Case Studies

R750 TREENET Inlet

Inlet components
• Kerb anchor block
• R 750 stainless steel faceplate
• M8 × 30 mm stainless steel cap bolts
• 100×50×90 mm PVC coupling

Read More

Goodwood Road upgrade 2017

Read More

Goodwood Road upgrade

Goodwood Road is a major thoroughfare through the suburb. A makeover in 2017 has improved the ambience and attraction for locals and visitors to the shopping and entertainment precinct.
The design by Jensen

Read More

Bowden Urban Village

In order to obtain approval from the EPA for the use of Water Treatment Solids (WTS) for the production of SPACE a 3 year environmental audit was conducted on a trial site at the new Bowden Urban Village development managed by Renewal SA

Read More

Manningham Inlet Project 2017

In November 2017 the City of Manningham in Victoria Australia installed 36 TREENET inlets in a problematic area subject to flooding to improve the recovery time after rain events .
Each inlet was connected to a 300 mm perforated pipe surrounded by aggregate in a 450 diam hole excavatedby hydrovac around existing infrastructure to the maximum depth permitted by bed rock.
The installation of the inlet component by Enviro Eng Civil is the best first effort by any contractor, particularly as no onsite instruction was available . This demonstrates that provided the simple process is followed , particularly the sequence of steps from formwork set up to removal and final finish before fitting the face plate, the result will be to specification.

Read More

City West Campus Adelaide 2006

At the Uni SA City West campus SPACE was installed to protect the root systems of semi mature trees which were previously growing in open ground and were now about to be paved over.

Read More